Project: BobCollins   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Bob Collins   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:1059
Total Expense:$101645.34
Start/Last Date:Jan 04, 2017 - No Finish Date
Engine:Rotax 912iS
Propeller:Sensenich
Panel:Dual screen G3X, autopilot
 
Friendly URL: https://eaabuilderslog.org?s=BobCollins

Home or Last Project Picture

Oct 27, 2018     Cable routing - (1.5 hours)       Category: Finishing
I routed the "C" and "E" cables as directed but ran into a problem after attaching them to the control column (and securing them a directed).

There's a pulley-- two pulleys, actually -- that sit on an AN-14A bolt just above a cable control bushing. But I could not get the center hole in the pulleys to allign with the bolt hole. It was hitting the control bushing.

I've sent a note off to support and I'll make another run at it today to see if I'm missing anything.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.